Search results
Crossing the island from Tuas Link to Pasir Ris, and measuring about 57km, the East-West Line (EWL) is the longest train line in operation in Singapore. It started as part of the North-South Line (NSL) and was expanded southwards towards Outram in 1987.
The East–West Line (EWL) is a high-capacity Mass Rapid Transit (MRT) line operated by SMRT in Singapore, running from Pasir Ris station in the east to Tuas Link station in the west, with an additional branch between Changi Airport and Tanah Merah stations.
2 days ago · The East-West Line is currently the longest train line in Singapore at 56.7 kilometres with 35 stations, from Tuas Link to Pasir Ris, with a branch line to Expo and Changi Airport through a shuttle service by transferring at Tanah Merah.
Jurong Region Line. Upgrading the North-South East-West Line. Tampines Walking and Cycling Town. See all projects. Highlights. Read the LTA Annual Report 2023/24 here!
Sep 30, 2024 · SINGAPORE: All the affected rail segments between Clementi and Ulu Pandan Depot have been replaced and a train endurance test is ongoing on a portion of the East-West Line.
Sep 30, 2024 · East-West Line MRT services to fully resume on Oct 1; westbound trains to run at slower speeds. Interactive: How a faulty MRT train left a trail of destruction.
Displaying the route from Tuas Link in the West to Pasir Ris in the East. The CG part of the EW line goes to the Changi Airport from the interchange station Tanah Merah ( EW4CG ). View the North-East Line map in full screen at Google .